NYC DOB record · X01388531-S7

1527 Sheridan Avenue

1527 Sheridan Avenue, Bronx, NY 10457

New building filing in Mount Eden-Claremont (West), Bronx. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 15, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01388531-S7

1527 Sheridan Avenue

Bronx, NY 10457

New building · status dated Sep 15, 2026

Current record
Approved
Proposed scale
12 stories
Dwelling units
99
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01388531-S7 as a new building at 1527 Sheridan Avenue, Bronx, NY 10457. Its latest published status category is Approved, dated Sep 15, 2026. The filing records 12 proposed stories and 99 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 15, 2026
Proposed scale
12 proposed stories and 99 proposed dwelling units
Applicant of recordSee the 251 filings that name Vasilios Artemiou PE
FiledAug 3, 2026
Current recordApproved
Proposed scale12 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Standpipe specifications filed in conjunction with gc application x01388531-i1

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01388531-S7.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 62,630 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01388531-S7
BIN
2131362
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
12
Existing dwelling units
Empty in the source
Proposed dwelling units
99