What the filing says
A public-record reading of the proposed work.
Suspended scaffold outrigger systems for facade restoration and inspection. no change in use, egress, or occupancy under this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 20-story elevator apartment building built in 1960, with 188 homes, on a 10,041 sq ft lot.
- Built
- 1960
- Floors
- 20
- Residential units
- 188
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C5-2
- Lot area
- 10,041 sq ft
- Building area
- 135,841 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 34 notices on file; the most recent was issued Jan 12, 2023.
- Hazardous condition (facade)
Issued Jan 12, 2023 — CYCLE 9C UNSAFE REPORT FILED
- Elevator
Issued Apr 23, 2020
- Plumbing
Issued Aug 12, 2018 — THE DOB INTENDS TO REVOKE ALL APPROVALS AND PERMITS UNDER PLUMBING LAA #140691927 DUE TO SUSPENSION OF MASTER PLUMBERS LICENSE. STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT AND OBTAIN A NEW MASTER PLUMBER TO SUPERSEDE THE PLUMBING PERMIT
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01293406-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01293406-I1
- BBL
- 1013120028
- Postal code
- 10022 · 1158 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source