What the filing says
A public-record reading of the proposed work.
Renovation/enlargement of exist 1 family dwelling, resolution of SWO, resolution of DOB violation, resolution of ECB violations, 39178650N; 39178649X; 39178648Y; 39178647M; 39178646K 39178645Z 39178644R
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story one-family home built in 1901, on a 12,000 sq ft lot.
- Built
- 1901
- Floors
- 3
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R3X
- Lot area
- 12,000 sq ft
- Building area
- 2,720 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 11, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Feb 27, 2026.
- Construction
Issued Feb 27, 2026 — UNPERMITTED/UNDOCUMENTED CONSTRUCTION / STRUCTURAL WORK PERFORMED AT CELLAR OF BUILDING. ACTIVE UNDERPINNING OF FOUNDATION. FLOOR ELEVATION EXCAVATED APPROX 12", WITH NO STRUCTURAL DETAIL/DRAWINGS/PERMITS FILED AS PER CODE. ENGINEERS REPORT FOR STRUCTURAL STABILITY REQUIRED
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S01382135-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,348 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01382135-I1
- BIN
- 5088839
- BBL
- 5080250016
- Postal code
- 10307 · 83 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 1
- Proposed dwelling units
- 1