What the filing says
A public-record reading of the proposed work.
Herewith filing for repair of damaged masonry and wood conditions per plans. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story elevator apartment building built in 1907, with 49 homes, on a 25,525 sq ft lot.
- Built
- 1907
- Last altered
- 2011
- Floors
- 5
- Residential units
- 49
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- M1-2/R6A
- Lot area
- 25,525 sq ft
- Building area
- 104,661 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 55 open notices on record for this building, out of 130 notices on file; the most recent was issued May 21, 2024.
- Construction
Issued May 21, 2024 — FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUFFRD FRM FAILURE TO MAINTAIN CONDITIONS@ALL EXPOSURES&ROOF.VARIOUS CRCKS OBSRVD PN EXT&INT OF ALL EXP FLR JOISTS,GIRDERS,POSTS HAD VARIOUS CRCKS&WERE STRCTRLLY COMPROMISED.OWNR TO IMMED RTAIN NYSPE TO EVAL ENT BLDG, DETERMNE STRCTRL STBILITY,&PREPARE/FILE RPAIR DWGS.BLDG TO BE RPAIRD
- Construction
Issued May 20, 2024 — EMERGENCY WORK ORDER.ON 5/19/24,THE PARAPET ALONG EXP4 HAD PARTIALLY CLLPSD DMGNG DELAMINGLE LEANING OUTWRD.LOOSE BRCKS MISSNG MOTOR JOINTS BRCKS THE SDWALK SHED&ADJCNT VEHICLES ON THE STREET.OWNR TO IMMED RTAIN NYSPE&DOB REG HC TO 1.IMMED PRVDE TEMP SHORNG&BRACNG INSIDE THE BLDG TO STABILIZE EXP4 WALL
- Construction
Issued May 20, 2024 — FAILURE TO MAITAIN BUILDING IN CODE COMPLIAANT MANNER . EXTERIOR, INTE RIOR CRACKS THROUGHOUT BUILDING ALLOWING WATER TO SEEP IN CAUSING WAT ER DAMAGE . DUE TO FAILURE TO MAINTAIN THIS 5 STORY BUILDIGN , THE PA RAPET HAS PARTIALLY COLLAPSED COMPROMISING STRUCTURAL STABILITY + SEC ONDARY MEANS OF EGRESS
52 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01115074-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01115074-I1
- BIN
- 3251737
- BBL
- 3023680001
- Postal code
- 11211 · 3571 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 0
- Proposed dwelling units
- 0