NYC DOB record · B00211184-P1

153 West 9 Street

153 West 9 Street, Brooklyn, NY 11231

Alteration filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00211184-P1

153 West 9 Street

Brooklyn, NY 11231

Alteration filing · status dated Dec 27, 2020

Current record
Approved
Proposed scale
3 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00211184-P1 as a alteration filing at 153 West 9 Street, Brooklyn, NY 11231. Its latest published status category is Approved, dated Dec 27, 2020. The filing records 3 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 27, 2020
Proposed scale
3 proposed stories and 3 proposed dwelling units
Complete building dossierView all 4 filings associated with BIN 3005688Applicant of recordSee the 31 filings that name Ntd Engineering Consultant LLC
FiledSep 15, 2020
Current recordApproved
Proposed scale3 stories
Recorded cost$100,000

What the filing says

A public-record reading of the proposed work.

CREATE SHORING TO STABILIZE THE EXISTING FLOORS OF THE BUILDING. DEMOLISH PARTIAL EXTERIOR WALLS. REBUILD THE EXTERIOR WALLS. This is filed in conjunction with DOB reference number: T00002216051-000143

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story walk-up apartment building built in 1901, with 3 homes, on a 1,683 sq ft lot.

Built
1901
Last altered
2016
Floors
3
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6B
Lot area
1,683 sq ft
Building area
2,079 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 3 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00211184-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00211184-P1
BBL
3003810049
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
3
Proposed dwelling units
3
Structural work