What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story store building built in 1938, on a 44,475 sq ft lot.
- Built
- 1938
- Last altered
- 2001
- Floors
- 4
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- C6-7T
- Lot area
- 44,475 sq ft
- Building area
- 119,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 21 open notices on record for this building, out of 222 notices on file; the most recent was issued Mar 20, 2021.
- Construction
Issued Mar 20, 2021 — AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO SIDEWA LK SHED DUE TO VEHICLE IMPACTING SHED AT 160 WETS 45TH STREET
- No report and / or late filing (facade)
Issued Jul 31, 2018 — FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
- Elevator
Issued May 2, 2013
18 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 12, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01469326-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01469326-I1
- BBL
- 1009970001
- Postal code
- 10036 · 726 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 0
- Proposed dwelling units
- 0