What the filing says
A public-record reading of the proposed work.
INstallation of new Verizon telecommunications site.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a utility property on a 26,573 sq ft lot.
- Residential units
- 0
- Building type
- Utility property
- Land use
- Transportation and utility
- Zoning district
- R4
- Lot area
- 26,573 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 27 notices on file; the most recent was issued Feb 19, 2026.
- Construction
Issued Feb 19, 2026 — EWO DUE TO CRACKED & DISPLACED DECORATIVE STONE ON CORNICE LOCATED @ EXP1 (N. ELEV) ABOVE 2ND WINDOW LINE. REMEDY: IMMEDIATELY INSTALL ADEQUATE SAFETY MEASURES TO PROTECT AND SECURE PUBLIC SAFETY. REMOVE ALL LOOSE MATERIAL UNDER SUPERVISION OF LICENSED NYS PROFESSIONAL (PROFESSIONAL ENGINEER/REGISTERED ARCHITECT)
- Construction
Issued Sep 24, 2024 — EMERGENCY WORK ORDER DUE TO CRACKED,SEPARATING & LOOSE MASONRY AT PARA LEVEL ACROSS ALL ELEVATIONS (EAST,NORTH,WEST & SOUTH). REMEDY:IMMEDIAT PROVIDE SAFETY MEASURES TO SECURE & PROTECT THE PUBLIC & INSTALL PUBLIC PROTECTION AT ALL EXPOSURES(NORTH,SOUTH & WEST).MAKE IMMEDIATE REPAIRS U/SUPERVISION OF LIC. PROF. REMOVE/SECURE ALL LOOSE/HANG MATER
- Local law 10/81 -
Issued Jan 13, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Current status updated01
The latest recorded filing status is “Filing Withdrawn.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00175985-I1
- BIN
- 3038027
- BBL
- 3014120035
- Postal code
- 11213 · 1603 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








