What the filing says
A public-record reading of the proposed work.
Mechanical specifications filed in conjunction with alt 1 job #321598623
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story walk-up apartment building built in 1899, with 3 homes, on a 2,033 sq ft lot.
- Built
- 1899
- Floors
- 3
- Residential units
- 3
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6
- Lot area
- 2,033 sq ft
- Building area
- 3,332 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 17 open notices on record for this building, out of 18 notices on file; the most recent was issued Aug 27, 2024.
- Construction
Issued Aug 27, 2024 — UNPERMITTED DEMOLITION, EXCAVATION, SUBGRADE, AND STRUCTURALWORK TOOK PLACE. THE UNPERMITTED WORK IS A POTENTIAL HAZARD TO PUBLIC& PROPERTY REMEDY: FAILURE TO COMPLY W, DOB #021022CE30101JT,TO PROVIDE MONTHLY INSPECTION REPORTS BY RDP UNTIL JOB IS PERMITTED
- Construction
Issued Mar 26, 2024 — FAILURE 2 COMPLY W. DOB VIO#011924CE30101JT. WRK 2 ENCLOSE STRUCTURE HAS NOT BEGUN. COMMENCE WORK TO ENCLOSE, UNDER PERMIT, BY 04/09/2024
- Construction
Issued Jan 19, 2024 — UNPERMITTED DEMOLITION COMPLETELY REMOVED EXPOSURE 3,LEAVING STRUCTURE OPEN TO THE ENVIRONMENT. REMEDY: RETAIN RDP TO PREPARE PLANS TO SEAL AND WATERPROOF SITE,FILE APPLICATION, PULL PERMITS, AND START WORK BY 2/29/24
14 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00501896-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00501896-I1
- BBL
- 3022180027
- Postal code
- 11211 · 3640 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 4
- Proposed dwelling units
- 6