What the filing says
A public-record reading of the proposed work.
Plumbing filing in conjunction with alt2 application b00546809. new fixtures to connectto existing water, gas, and sanitary system. two new toilets in cel, no new storm lines proposed. 1 new hwh and 2 new furnaces proposed. addressing violations
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story store building built in 1931, on a 2,000 sq ft lot.
- Built
- 1931
- Last altered
- 2019
- Floors
- 2
- Residential units
- 2
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- C8-2
- Lot area
- 2,000 sq ft
- Building area
- 3,200 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 37 notices on file; the most recent was issued Feb 24, 2017.
- Low pressure boiler
Issued Feb 24, 2017 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
- Construction
Issued Feb 28, 2011
- Local law 62/91 - boilers
Issued Aug 16, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00546816-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00546816-P1
- BBL
- 3065460006
- Postal code
- 11230 · 1515 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2