NYC DOB record · Q01418029-I1

155-35 Linden Boulevard

155-35 Linden Boulevard, Queens, NY 11434

Alteration filing in South Jamaica, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01418029-I1

155-35 Linden Boulevard

Queens, NY 11434

Alteration filing · status dated Aug 31, 2026

Current record
Approved
Proposed scale
2 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01418029-I1 as a alteration filing at 155-35 Linden Boulevard, Queens, NY 11434. Its latest published status category is Approved, dated Aug 31, 2026. The filing records 2 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 31, 2026
Proposed scale
2 proposed stories and 2 proposed dwelling units
Applicant of recordSee the 244 filings that name Ikra Consulting LLC
FiledAug 25, 2026
Current recordApproved
Proposed scale2 stories
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

New metal stairs to replace existing deteriorated wooden stairs to cellar.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story two-family home built in 1950, on a 2,000 sq ft lot.

Built
1950
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R3-1
Lot area
2,000 sq ft
Building area
1,280 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Sep 12, 2022.

  • Construction

    Issued Sep 12, 2022 — FAILURE TO COMPLY W/COMMISSIONER'S ORDER #340616(040122FEU41203PN) DATED 04/01/22 REQUIRING OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLDG AND FILE REPAIR DWGS. BLDG WAS REQ'D TO BE REPAIRED UNDER PERMIT BY 5/2/22 & COMPLETED & SIGNED OFF BY 5/22/22 AS OF 9/12/22 THERE WERE NO JOBS FILED ON BIS OR DOB NOW. REMEDY: IMMED COMPLY W/COMMISSIONER'S ORDER

  • Construction

    Issued Apr 1, 2022 — FAIL TO MAINTAIN-EXP1 LINTELS CORRODED W/DETERIORATED MORTARJOINTS & BULGING MASONRY @ LINTEL ENDS.EXP3-2FL LINTELS PREV MORTARJOINT RPRS EXP1&3 LINTLS SUROUNDING BRCK QUESTION.ROOF DETERIORTED OWNR RETAIN NYSPE-EVAL ENTIRE BLDG&PREP REPAIR DWGS.BLDG RPR UNDR PRMT START BY 5/2/2022 COMPLETED/SIGNOFF BY 05/27/2022

  • Construction

    Issued Apr 1, 2022 — FAIL TO MAINTAIN-EXP1 LINTEL@2FL NEAR EXP1/2 CORNER CORRODEDPARTIALLY DETACHED,SAGGING&@RISK OF COLLAPSE INTO FRONT YARD.EXP1 2FLLINTEL @CENTER WINDOW-DETERIORATED MASONRY FACADE PART DETACHD @ LINTEL OWNR RETAIN NYSPE-EVAL ENTIRE BLDG&PREP RPR DWGS.BLDG REPAIR UNDR PRMT START BY 4/18/22,COMPLTD/SIGNOF BY 05/06/2022

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01418029-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 65,533 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01418029-I1
BIN
4263830
BBL
4121720066
Review type
Professional Certification
Existing stories
2
Proposed stories
2
Existing dwelling units
2
Proposed dwelling units
2
General construction