NYC DOB record · B00075326-I1

1550 Bedford Avenue

1550 Bedford Avenue, Brooklyn, NY 11225

Alteration filing in Crown Heights (South), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00075326-I1

1550 Bedford Avenue

Brooklyn, NY 11225

Alteration filing · status dated Dec 28, 2020

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00075326-I1 as a alteration filing at 1550 Bedford Avenue, Brooklyn, NY 11225. Its latest published status category is Approved, dated Dec 28, 2020. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 28, 2020
Proposed scale
Not stated in this filing
Applicant of recordSee the 504 filings that name Patuxent Engineering LLC
FiledAug 30, 2018
Current recordApproved
Proposed scaleNot specified
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk bridge approx. 95' linear feet & site fence for pedestrian safety during construction. sidewalk bridge & site fence shall comply with chapter 33 of the 2014 NYC building code. no change in use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story hotel built in 2018, on a 19,200 sq ft lot.

Built
2018
Last altered
2017
Floors
5
Residential units
0
Building type
Hotel
Land use
Commercial and office
Zoning district
C8-2
Lot area
19,200 sq ft
Building area
61,848 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00075326-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00075326-I1
BIN
3426173
BBL
3012660036
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source