What the filing says
A public-record reading of the proposed work.
Curb cut filed in conjunction with NB# 321191517.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story educational building built in 2022, on a 6,935 sq ft lot.
- Built
- 2022
- Last altered
- 2019
- Floors
- 9
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- M1-2D
- Lot area
- 6,935 sq ft
- Building area
- 33,253 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 12 notices on file; the most recent was issued Aug 4, 2025.
- Immediate
Issued Aug 4, 2025 — REPAIR OR REPLACE ALL DAMAGED SECTIONS OF THE CONSTRUCTION FENCE, INCLUDING SECURING AND PROPERTY POSTING SIGNAGE. INSTALL APPROPRIATE PUBLIC PROTECTION AS NEEDED. REMOVE DEBRIS AND REPAIR SIDEWALK TO RESTORE SAFE PEDESTRIAN PASSAGE
- Failure to post energy
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- Failure to
Issued Aug 2, 2024 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00511294-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00511294-I1
- BBL
- 3006300022
- Postal code
- 11215 · 4239 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0