What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1926, with 21 homes, on a 6,700 sq ft lot.
- Built
- 1926
- Floors
- 4
- Residential units
- 21
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R5B
- Lot area
- 6,700 sq ft
- Building area
- 12,990 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 28, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 7 notices on file; the most recent was issued Feb 16, 2026.
- Construction
Issued Feb 16, 2026 — REQUESTING ENGINEERING REPORT. AT TIME OF INSPECTION OBSERVED EXPOSURE 1(FRONT), 2(LEFT), 1&4 FLOOR VERTICAL HORIZONTAL, HORIZONTAL RUNNING CRACK & LOOSE STUCCO AROUND WINDOWS WITH POTENTIAL FOR FALLING DEBRIS, EXPO 1,2,3,4, 1 FLOOR SPIDER CRACKS THROUGHOUT CREATING HAZARDOUS CONDITIONS STRUCTURE STABILITY IN QUESTION.
- Immediate
Issued Feb 17, 2025 — REMEDY_ ERECT SIDEWALK SHED
- Fail to certify class
Issued Jul 11, 2018 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 28, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01362912-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “OnHold-NoGoodCheck.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,094 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01362912-I1
- BIN
- 4121629
- BBL
- 4053890027
- Postal code
- 11358 · 129 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 21
- Proposed dwelling units
- 21