NYC DOB record · B00343373-I1

158 Green Street

158 Green Street, Brooklyn, NY 11222

Alteration filing in Greenpoint, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00343373-I1

158 Green Street

Brooklyn, NY 11222

Alteration filing · status dated Sep 3, 2025

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
24
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00343373-I1 as a alteration filing at 158 Green Street, Brooklyn, NY 11222. Its latest published status category is Recorded as completed, dated Sep 3, 2025. The filing records 24 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 3, 2025
Proposed scale
24 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3064144Applicant of recordSee the 158 filings that name Tectonic Engineering
FiledAug 13, 2020
Current recordRecorded as completed
Proposed scale24 units
Recorded cost$31,600

What the filing says

A public-record reading of the proposed work.

AT&T - Replacement of existing antennas and installation of RRH units on roof. Removal, replacement, and retrofit of cabinets with reinforcement of platform on the roof. All work in compliance with TPPN 5/98. No change to occupancy, use or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1916, with 24 homes, on a 4,429 sq ft lot.

Built
1916
Floors
5
Residential units
24
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R7A
Lot area
4,429 sq ft
Building area
19,750 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 20 notices on file; the most recent was issued Dec 1, 2025.

  • Construction

    Issued Dec 1, 2025 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B00736827-I1 ON 11/26/25 DUE TO CONTRACTOR WITHDRAWAL.

  • Construction

    Issued Mar 6, 2020 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER .PERMIT #321570055 ON 3/4/2020 DUE TO SUSPENSION OF PERMIT, INTENT TO REVOKE.

  • Construction

    Issued Mar 6, 2020 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER .PERMIT #321570055 ON 3/4/2020 DUE TO SUSPENSION OF PERMIT, INTENT TO REVOKE.

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00343373-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00343373-I1
BBL
3025220040
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
24
Proposed dwelling units
24
antenna