NYC DOB record · B00207495-I1

1583 Rockaway Parkway

1583 Rockaway Parkway, Brooklyn, NY 11236

Alteration filing in Canarsie, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00207495-I1

1583 Rockaway Parkway

Brooklyn, NY 11236

Alteration filing · status dated Jan 21, 2025

Current record
Recorded as completed
Proposed scale
7 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00207495-I1 as a alteration filing at 1583 Rockaway Parkway, Brooklyn, NY 11236. Its latest published status category is Recorded as completed, dated Jan 21, 2025. The filing records 7 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jan 21, 2025
Proposed scale
7 proposed stories
The building, not the filingthe owner of record and every filing at BIN 3428727Applicant of recordSee the 232 filings that name Steel Core Engineering PLLC
FiledJan 21, 2020
Current recordRecorded as completed
Proposed scale7 stories
Recorded cost$319,979

What the filing says

A public-record reading of the proposed work.

Construction of new 7 story cast-in-place concrete building extension. Structure for this building is to consist of concrete columns, shear walls & floor slabs. Additional localized new structures are to consist of masonry and light gauge framing

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story health facility built in 1975, on a 55,987 sq ft lot.

Built
1975
Last altered
2010
Floors
7
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
R5
Lot area
55,987 sq ft
Building area
99,009 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 31 notices on file; the most recent was issued Jan 31, 2019.

  • No report and / or late filing (facade)

    Issued Jan 31, 2019 — FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00207495-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00207495-I1
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
7
Proposed stories
7
Existing dwelling units
0
Proposed dwelling units
0
Structural work