What the filing says
A public-record reading of the proposed work.
Repair fire damage to the floor joists, walls, roof rafters, and party wall. remove exist. balcony and replace with new balcony. replace sheetrock throughout house damaged by water.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story two-family home built in 1984, on a 3,225 sq ft lot.
- Built
- 1984
- Floors
- 3
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R3-2
- Lot area
- 3,225 sq ft
- Building area
- 2,220 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 4 notices on file; the most recent was issued May 13, 2026.
- Construction
Issued May 13, 2026 — FTC W/COMMISSIONER'S ORDER:EMERGENCY WORK ORDER 350680 (041626FEU50103BP)DATED 04/16/26 REQUIRING OWNR TO IMMED SUBMIT MEANS & METHODS FOR TEMP SHORING & WEATHERPROOFING THE BLDG AS REQ'D TO FEU FOR REVIEW & APPROVAL.AS OF 05/13/26 FEU HAS NOT REC'D PROPOSED MEANS& METHODS FOR APPROVAL.IMMED COMPLY W/COMMISSIONER'S ORDER 350680
- Construction
Issued Apr 16, 2026 — STRUCTURE RENDER NONCOMPLIANCE DUE TO FIRE THAT OCCURRED AT 157 ADE DRIVE AFFECTING 159 ADA DRIVE CAUSING SEVERE DAMAGE TO REAR OF PROPERTY.
- Construction
Issued Apr 16, 2026 — EMERGENCY WORK ORDER.THE BLDG SFFRD FIRE DMG ON/AROUND 4/16/26.THE REAR OF THE BLDG HAS SFFRD FIRE DMG ON 2ND&3RDFL LVLS ALNG W/EXP2/3 CRNR ON 2NDFL&ARE OPEN TO THE ELEMNTS.3RDFL WOOD JOISTS.OWNR TO RTAIN NYSPE&GC REG W/DOB IMMED 1.NYYSPE TO SBMT MEANS &METHDS FOR WTHRPRFNG& TEMP SHORNG THE BLDG AS REQ'D BY FEU
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S01403190-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01403190-I1
- BBL
- 5016580090
- Postal code
- 10314 · 313 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 2
- Proposed dwelling units
- 2