NYC DOB record · B01460471-I1

159 Division Avenue

159 Division Avenue, Brooklyn, NY 11211

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01460471-I1

159 Division Avenue

Brooklyn, NY 11211

Alteration filing · status dated Sep 18, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01460471-I1 as a alteration filing at 159 Division Avenue, Brooklyn, NY 11211. Its latest published status category is Approved, dated Sep 18, 2026. The filing records 3 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 18, 2026
Proposed scale
3 proposed stories and 2 proposed dwelling units
Applicant of recordSee the 16 filings that name Golden Ratio Engineering LLC
FiledSep 17, 2026
Current recordApproved
Proposed scale3 stories
Recorded cost$37,500

What the filing says

A public-record reading of the proposed work.

Rehabilitation and repair facade components and provide waterproofing. No change in egress, use or bulk.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story mainly residential with some commercial built in 1920, on a 2,095 sq ft lot.

Built
1920
Last altered
1995
Floors
3
Residential units
2
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
2,095 sq ft
Building area
4,557 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 31 open notices on record for this building, out of 31 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued Oct 1, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#341495 VIO#PI30102SB DATED 7/15/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 08/15/25 & STARTING BLDG RPRS UNDER PERMIT BY 09/15/25&COMPL/SIGNOFF BY 10/15/25 AS OF 10/1/25 THE CAP&EVIDENCE OF COMPL REPR WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER 241495 VIO#PI30102SB TO PROV A CAP

  • Construction

    Issued Jul 15, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 SPALLING MASONRY @ MULT LOCATIONS DAMAGED/SPALLING CORNICE @ PARAPET LEVEL & DETERIORATED MORTAR JOINT @ MAIN DOOR ENTRANCE. ON ROOF OBSVD MISSING/LOOSE STONE IMMED RETAIN A REG DESIGN PROF TO EVAL THE ENTIRE BLDG & TO SUBMIT A CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV BY 8/15/25

  • 28 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01460471-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01460471-I1
BIN
3059744
BBL
3021480042
Review type
Professional Certification
Existing stories
3
Proposed stories
3
Existing dwelling units
2
Proposed dwelling units
2
General construction