NYC DOB record · M00851087-S1

159 West 54 Street

159 West 54 Street, Manhattan, NY 10019

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00851087-S1

159 West 54 Street

Manhattan, NY 10019

Alteration filing · status dated Oct 1, 2026

Current record
Approved
Proposed scale
15 stories
Dwelling units
40
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00851087-S1 as a alteration filing at 159 West 54 Street, Manhattan, NY 10019. Its latest published status category is Approved, dated Oct 1, 2026. The filing records 15 proposed stories and 40 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 1, 2026
Proposed scale
15 proposed stories and 40 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 1023382Applicant of recordSee the 57 filings that name Concessi Engineering, P.C.
FiledNov 7, 2023
Current recordApproved
Proposed scale15 stories
Recorded cost$45,000

What the filing says

A public-record reading of the proposed work.

Relocation of toilets, showers and lavatories in baths,kitchen sink, installation of washer and dishwasher. inst of toilet and lavatory and sink in roof terracee bar. new water line for water fixture. no change of use,egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story elevator apartment building built in 1923, with 54 homes, on a 7,541 sq ft lot.

Built
1923
Last altered
1982
Floors
15
Residential units
54
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
C6-6
Lot area
7,541 sq ft
Building area
85,309 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00851087-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00851087-S1
BBL
1010070001
Review type
Professional Certification
Existing stories
15
Proposed stories
15
Existing dwelling units
40
Proposed dwelling units
40