What the filing says
A public-record reading of the proposed work.
Mechanical work associated to the apartment renovation on the fifth floor to apartment unit 5b. new duct installation, and mechanical unit install. no change to use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story elevator apartment building built in 1839, with 16 homes, on a 5,234 sq ft lot.
- Built
- 1839
- Floors
- 5
- Residential units
- 16
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-2
- Lot area
- 5,234 sq ft
- Building area
- 18,616 sq ft
- Historic district
- Greenwich Village Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 20 notices on file; the most recent was issued Nov 14, 1988.
- Elevator
Issued Nov 14, 1988 — 43)REPAIR OR RENEW GUIDE SHOE'S 47)PROVIDE ACCESS TO MOTOR ROOM 1)PROPERLY FUSE CONTROLLER (REMOVE WIRE FROM FUSE)
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01432241-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 65,533 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01432241-S2
- BBL
- 1005680011
- Postal code
- 10003 · 407 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 17
- Proposed dwelling units
- 17