NYC DOB record · B00446703-I1

160 Henry Street

160 Henry Street, Brooklyn, NY 11201

Alteration filing in Brooklyn Heights, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00446703-I1

160 Henry Street

Brooklyn, NY 11201

Alteration filing · status dated Oct 18, 2021

Current record
Recorded as completed
Proposed scale
9 stories
Dwelling units
35
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00446703-I1 as a alteration filing at 160 Henry Street, Brooklyn, NY 11201. Its latest published status category is Recorded as completed, dated Oct 18, 2021. The filing records 9 proposed stories and 35 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 18, 2021
Proposed scale
9 proposed stories and 35 proposed dwelling units
Complete building dossierView all 9 filings associated with BIN 3001819Applicant of recordSee the 5 filings that name Anzalone Architecture PLLC
FiledFeb 22, 2021
Current recordRecorded as completed
Proposed scale9 stories
Recorded cost$83,600

What the filing says

A public-record reading of the proposed work.

Interior Alterations to Apt 4D on the 4th Floor. Demolish and construct non bearing interior partitions, finishes, and cabinets. No change to use, egress, or occupancy. Plumbing filed separately.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 10-story elevator apartment building built in 1924, with 35 homes, on a 9,089 sq ft lot.

Built
1924
Floors
10
Residential units
35
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
9,089 sq ft
Building area
66,400 sq ft
Historic district
Brooklyn Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 39 notices on file; the most recent was issued Mar 26, 2024.

  • Construction

    Issued Mar 26, 2024 — FAILURE TO RESPOND TO OBJECTIONS ISSUED FOR TPP AUDIT FOR INADEQUATE TENANT PROTECTION PLAN FOR JOB #B00916129-I1.

  • Construction

    Issued Mar 18, 2024 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT# B00874359 ON 3/14/24. REVOCATION OF APPROVAL(S) AND PERMIT(S).

  • Construction

    Issued Mar 18, 2024 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT# B00874359 ON 3/14/24. REVOCATION OF APPROVAL(S) AND PERMIT(S).

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00446703-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00446703-I1
BBL
3002360001
Review type
Standard Plan Examination
Existing stories
9
Proposed stories
9
Existing dwelling units
35
Proposed dwelling units
35
General construction