NYC DOB record · B00476002-I1

160 Underhill Avenue

160 Underhill Avenue, Brooklyn, NY 11238

Alteration filing in Prospect Heights, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00476002-I1

160 Underhill Avenue

Brooklyn, NY 11238

Alteration filing · status dated Feb 15, 2023

Current record
Approved
Proposed scale
2 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00476002-I1 as a alteration filing at 160 Underhill Avenue, Brooklyn, NY 11238. Its latest published status category is Approved, dated Feb 15, 2023. The filing records 2 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Feb 15, 2023
Proposed scale
2 proposed stories and 3 proposed dwelling units
Applicant of recordSee the 7 filings that name Bryce Taylor, Architect
FiledJun 15, 2022
Current recordApproved
Proposed scale2 stories
Recorded cost$151,150

What the filing says

A public-record reading of the proposed work.

Renovation of top floor of existing 3-family house. remove and install interior partitions, new sevice stair from 2nd floor to roof. new terraces and guard rails to two roofs. see additional related work as per plan. no change of use, egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story walk-up apartment building built in 1906, with 3 homes, on a 2,000 sq ft lot.

Built
1906
Floors
2
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6B
Lot area
2,000 sq ft
Building area
3,040 sq ft
Historic district
Prospect Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00476002-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00476002-I1
BIN
3029143
BBL
3011650151
Review type
Standard Plan Examination
Existing stories
2
Proposed stories
2
Existing dwelling units
3
Proposed dwelling units
3
General construction