What the filing says
A public-record reading of the proposed work.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 NYC building code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story garage or fuel station built in 1892, on a 10,612 sq ft lot.
- Built
- 1892
- Floors
- 2
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- C4-5
- Lot area
- 10,612 sq ft
- Building area
- 36,000 sq ft
- Historic district
- Greenwich Village Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 4 notices on file; the most recent was issued May 4, 2023.
- Construction
Issued May 4, 2023 — COMMISSIONER S REQUEST FOR CORRECTIVE ACTION. LNO# 4546 ISSUED ON 12/29/2017 INDICATES BUILDING WITH 93 CARS IN TOTAL, 31 ON EACH FL. EACH LEVEL IS OVERLOADED WITH ADDITIONAL CARS BEING STORED ON LIFTS AND VARIOUS PLACES AND ON DEFECTIVE WOOD JOISTS. NOTED CELLAR WITH 68 CARS, 1ST FL WITH 48 AND 2ND WITH 61. THIS IS CONTRARY TO THE LNO ON
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01162741-S1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01162741-S1
- BBL
- 1006100017
- Postal code
- 10014 · 576 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 0
- Proposed dwelling units
- 0