NYC DOB record · M01384396-I1

160 West 66 Street

160 West 66 Street, Manhattan, NY 10023

Alteration filing in Upper West Side-Lincoln Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01384396-I1

160 West 66 Street

Manhattan, NY 10023

Alteration filing · status dated Oct 27, 2026

Current record
Recorded as completed
Proposed scale
56 stories
Dwelling units
344
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01384396-I1 as a alteration filing at 160 West 66 Street, Manhattan, NY 10023. Its latest published status category is Recorded as completed, dated Oct 27, 2026. The filing records 56 proposed stories and 344 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 27, 2026
Proposed scale
56 proposed stories and 344 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1077844Applicant of recordSee the 15 filings that name Luis Pichardo, PE
FiledApr 28, 2026
Current recordRecorded as completed
Proposed scale56 stories
Recorded cost$190,225

What the filing says

A public-record reading of the proposed work.

Interior renovation of existing apartment 46A on the 46th floor architectural / construction work only.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 45-story condominium built in 1989, with 343 homes, on a 28,455 sq ft lot.

Built
1989
Floors
45
Residential units
343
Building type
Condominium
Land use
Elevator apartments
Zoning district
C4-7
Lot area
28,455 sq ft
Building area
396,861 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 113 notices on file; the most recent was issued Jul 31, 2018.

  • No report and / or late filing (facade)

    Issued Jul 31, 2018 — FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018

  • No report and / or late filing (facade)

    Issued Aug 30, 2013 — FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012

  • Elevator

    Issued Jun 19, 2008

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01384396-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01384396-I1
BBL
1011377501
Review type
Standard Plan Examination
Existing stories
56
Proposed stories
56
Existing dwelling units
344
Proposed dwelling units
344
General construction