What the filing says
A public-record reading of the proposed work.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 10-story elevator apartment building built in 2009, with 78 homes, on a 12,000 sq ft lot.
- Built
- 2009
- Floors
- 10
- Residential units
- 78
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7D
- Lot area
- 12,000 sq ft
- Building area
- 76,980 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 57 notices on file; the most recent was issued Mar 5, 2025.
- Fail to certify class
Issued Mar 5, 2025 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Fail to certify class
Issued Apr 13, 2022 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Jan 12, 2022 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED CONCRETE SLAB OVER PARKING GARAGE WHERE WATER HAS PENETRATED SLAB ALONG WITH SEVERE CRACKS. A SECTION HAS DETACHED EXPOSING REBAR.
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01450133-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01450133-I1
- BIN
- 3397047
- BBL
- 3016990027
- Postal code
- 11213 · 1678 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source