What the filing says
A public-record reading of the proposed work.
Application filed for interior renovation of office space. No change to use, egress, or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 124 notices on file; the most recent was issued Jan 20, 2026.
- Construction
Issued Jan 20, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE. NOTED AT THE TIME OF INSPECTION MINOR MASONRY CRACKS AT EXPOSURE 1, BROKEN GLASS AT EXPOSURE 2, AT ROOF TOP ELEVATION HAIRLINE CRACKS ON BULKHEAD AS WELL AS SOME SPALLING BRICKS REMEDY: REPAIR AND OR REPLACE
- Construction
Issued Feb 9, 2025 — FAILURE TO MAINTAIN BUILDING WALLS OR APPURTANCES IN A CODE COMPLIANT MANNER . NOTED ; AT EXPOSURE # 1& 4 AT THE PARAPET LEVEL THE CORNICE IS DETERIORATED & PULLING AWAY IN VARIOUS LOCATIONS ERECT A SIDEWALK SHED FOR PUBLIC SAFETY. SUBMIT ENGINEERS REPORT FOR CONDITONS CITED T ERTINSPECTIONS@BUILDINGS.NYC.GOV WITHIN 48 OURS 718-286-3460
- Elevator
Issued Nov 13, 2007
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01352551-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01352551-I1
- BBL
- 1005050031
- Postal code
- 10013 · 611 filings
- Review type
- Professional Certification
- Existing stories
- 15
- Proposed stories
- 15
- Existing dwelling units
- 0
- Proposed dwelling units
- 0