What the filing says
A public-record reading of the proposed work.
This job is filed to rectify DOB violation #011102c13fc01, repair to face brick and details as per plan. work completed under job #321585682 & 301344702. there is no change in use, means of egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story elevator apartment building built in 1964, with 64 homes, on a 16,000 sq ft lot.
- Built
- 1964
- Floors
- 8
- Residential units
- 64
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 16,000 sq ft
- Building area
- 49,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 16 notices on file; the most recent was issued Apr 10, 2024.
- Hazardous condition (facade)
Issued Apr 10, 2024 — CYCLE 9A UNSAFE REPORT FILED
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
- Local law 62/91 - boilers
Issued Jan 1, 2009
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00485220-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00485220-I1
- BBL
- 3087190073
- Postal code
- 11235 · 1335 filings
- Review type
- Professional Certification
- Existing stories
- 8
- Proposed stories
- 8
- Existing dwelling units
- 150
- Proposed dwelling units
- 150