NYC DOB record · M00225792-I1

161 Maiden Lane

161 Maiden Lane, Manhattan, NY 10038

Alteration filing in Financial District-Battery Park City, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00225792-I1

161 Maiden Lane

Manhattan, NY 10038

Alteration filing · status dated Sep 23, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
98
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00225792-I1 as a alteration filing at 161 Maiden Lane, Manhattan, NY 10038. Its latest published status category is Recorded as completed, dated Sep 23, 2026. The filing records 98 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 23, 2026
Proposed scale
98 proposed dwelling units
The building, not the filingopen housing violations and every filing at BIN 1090257Applicant of recordSee the 576 filings that name Patuxent Engineering LLC
FiledSep 11, 2019
Current recordRecorded as completed
Proposed scale98 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of heavy duty sidewalk bridge for pedestrian safety during construction. sidewalk bridge shall comply with chapter 33 of the 2014 NYC cc. no change in use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 57-story condominium built in 2016, with 98 homes, on a 4,836 sq ft lot.

Built
2016
Last altered
2016
Floors
57
Residential units
98
Building type
Condominium
Land use
Elevator apartments
Zoning district
C5-3
Lot area
4,836 sq ft
Building area
116,680 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 38 notices on file; the most recent was issued Jul 29, 2021.

  • Construction

    Issued Jul 29, 2021 — THE DEPARTMENT OF BUILDING ORDERS THAT YOU STOP ALL WORK UNDER APPLICATION #123504225 DUE TO CONTRACTOR'S WITHDRAWAL.

  • Construction

    Issued Jun 4, 2021 — BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION #140789902 .DUE TO CONTRACTOR WITHDRAWAL. DID NOT OBSERVED TPP POSTED AT ENTRANCE OF BUILDING DUE TO NEW CONSTRUCTION.

  • Construction

    Issued Jun 4, 2021 — BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION #123504234 .DUE TO CONTRACTOR WITHDRAWAL

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00225792-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00225792-I1
BBL
1000727502
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
98
Sidewalk shed