NYC DOB record · B01307074-I1

161 Saratoga Avenue

161 Saratoga Avenue, Brooklyn, NY 11233

Alteration filing in Ocean Hill, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01307074-I1

161 Saratoga Avenue

Brooklyn, NY 11233

Alteration filing · status dated Sep 21, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01307074-I1 as a alteration filing at 161 Saratoga Avenue, Brooklyn, NY 11233. Its latest published status category is Approved, dated Sep 21, 2026. The filing records 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 21, 2026
Proposed scale
4 proposed dwelling units
Applicant of recordSee the 48 filings that name Bangash Associates INC.
FiledOct 27, 2025
Current recordApproved
Proposed scale4 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of NYC code 2022. no change in use, occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story mainly residential with some commercial built in 1906, with 4 homes, on a 1,716 sq ft lot.

Built
1906
Floors
3
Residential units
4
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
1,716 sq ft
Building area
4,558 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 14 open notices on record for this building, out of 16 notices on file; the most recent was issued Sep 14, 2026.

  • Construction

    Issued Sep 14, 2026 — STRUCTURAL PEER REVIEW.REVISD DQGS TO STBLZE THE BLDG SUBMITTD BY NYSPE #068504 VIA EMAIL TO DOB FEU ON 12/23/25,1/26/26,2/12/26,7/17/26 &8/5/26 WERE INCMPLTE,DEFICIENT&NOT CODE COMPLIANT.1.OWNR TO PRVDE NAMES OF NYSPE STRCTRL ENG IN GOOD STANDNG W/KNOWLEGDE & EXP OF SIMILAR STRCTRE BY 9/21/26

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • 11 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01307074-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01307074-I1
BIN
3041069
BBL
3015150001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
4
Proposed dwelling units
4
Sidewalk shed