What the filing says
A public-record reading of the proposed work.
Alt-2 filing for repair of damaged front facade and side exterior walls, including chimney, to resolve DOB violation #010826cpi40701ag (no change of use, egress, or occupancy).
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story garage or fuel station built in 1931, on a 12,375 sq ft lot.
- Built
- 1931
- Floors
- 2
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Transportation and utility
- Zoning district
- R4-1
- Lot area
- 12,375 sq ft
- Building area
- 5,244 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Jan 8, 2026.
- Construction
Issued Jan 8, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-@ EXP1,6 BRICKS ARE CRACKED AND PARTIALLY DISLODGED @ RIGHT SIDE OF MIDDLE WINDOW OPENING W/A STEP CRACK ABOVE LEFT 2FL WINDOW. OWNER TO IMMED RETAIN NYSPE TO EVAL THE ENTIRE BLDG. PREPARE/FILE REPAIR DWGS. REPAIR BLDG UNDER PERMIT. START WORK BY 02/22/2026
- Construction
Issued Jan 7, 1991 — JV
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01451199-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01451199-I1
- BIN
- 4123958
- BBL
- 4054610044
- Postal code
- 11358 · 159 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 0
- Proposed dwelling units
- 0