What the filing says
A public-record reading of the proposed work.
Interior renovation of existing apartment #15 at fourth floor replace existing roof wood joist 3x8 @ 16 o.c. damaged by water as per plan.this filing is intended to address oath/ecb violation no. 39177557y
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1916, with 16 homes, on a 6,250 sq ft lot.
- Built
- 1916
- Floors
- 4
- Residential units
- 16
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7A
- Lot area
- 6,250 sq ft
- Building area
- 17,360 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 10 notices on file; the most recent was issued Feb 17, 2026.
- Construction
Issued Feb 17, 2026 — REQUESTING AN ENGINEER REPORT DUE TO A CEILING COLLAPSING IN A BEDROOM AT APT15. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES APARTMENT HAS SUSTAINED.
- Construction
Issued Jul 9, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01374784-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,497 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01374784-I1
- BIN
- 3117595
- BBL
- 3051220025
- Postal code
- 11226 · 2484 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 16
- Proposed dwelling units
- 0