NYC DOB record · B01473059-I1

1627 50 Street

1627 50 Street, Brooklyn, NY 11204

Alteration filing in Borough Park, Brooklyn. The latest DOB status is objections.

The examiner raised objections. The applicant has to resolve them before the filing can be approved. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01473059-I1

1627 50 Street

Brooklyn, NY 11204

Alteration filing · status dated Oct 26, 2026

Current record
Under review
Proposed scale
Not stated
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01473059-I1 as a alteration filing at 1627 50 Street, Brooklyn, NY 11204. Its latest published status category is Under review, dated Oct 26, 2026. The filing records 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Oct 26, 2026
Proposed scale
3 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 3129201Applicant of recordSee the 187 filings that name Asher Architect
FiledOct 14, 2026
Current recordUnder review
Proposed scale3 units
Recorded cost$100,000

What the filing says

A public-record reading of the proposed work.

Plumbing work for New building filed in conjunction with GC #B01202461-I1

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story walk-up apartment building built in 1975, with 3 homes, on a 4,007 sq ft lot.

Built
1975
Floors
3
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R5
Lot area
4,007 sq ft
Building area
4,860 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Apr 16, 2024.

  • Construction

    Issued Apr 16, 2024 — INSPECTION ON 8/3/23 REVEALED BLDG'S UNREINF MASONRY WALLS.PART DEMO'D W/O PERMITS RENDERING IT STRUCTURALLY COMPROMISED & OPEN.TO ELEMENTS REMEDY:

  • Construction

    Issued Mar 11, 2024 — INSPECTION BY DEPARTMNT 8/03/23, REVEALED BLDG'S UNREINF MASONRY WALLS PART.DEMOD W/O PERMITS RENDERING IT STRUCTURALLYCOMPROMISED AND OPEN 2 ELEMENTS. REMEDY: OWNR FAIL2COMPLY BY FILNG APPL BY10/26/23&TECH AUDIT DOCS BY 10/27/23.COMPLY W CODE&ORDER.SUBMT TECH AUDIT BY 4/12/24

  • Construction

    Issued Sep 7, 2023 — INSPECTION BY DEPARTMENT 8/03/23,REVEALED BLDG'S UNREINF MASONRY WALLS PART.DEMOD W/O PERMITS RENDERING IT STRUCTURALLY COMPROMISED AND OPEN TO ELEMENTS. REMEDY: FILE APPLIC. W/ DOB BY 10/26/23 FOR ALL UNPERMIT TED & PROPOSED WRK.SUBMIT ALL FILES FOR TECHNICAL AUDIT BY 10/27/23

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01473059-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Objections.”

    02

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01473059-I1
BBL
3054540078
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
3
Proposed dwelling units
3