What the filing says
A public-record reading of the proposed work.
Install 11.5 ton rooftop packaged HVAC unit on roof to serves 1st fl. install 16 and 6 tons vrf with fan coil units and distribution for cellar, mezz and 2nd fl. install air cleaner and make up air fan and bathroom and kitchen hood exhaust.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story store building built in 1892, on a 2,500 sq ft lot.
- Built
- 1892
- Floors
- 2
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- R7-2
- Lot area
- 2,500 sq ft
- Building area
- 5,000 sq ft
- Historic district
- South Village Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 8 notices on file; the most recent was issued Sep 14, 2022.
- Structurally compromised
Issued Sep 14, 2022 — FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.
- Construction
Issued Oct 14, 2021 — FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER DOB# 052421FEU10202IK REQ'D THAT AN APPLICATION TO REPAIR THE BLDG BY FILED BY AUGUST 1, 2021 AND THAT REPAIRS BEGIN BY SEPTEMBER 1 2021 ATOI, NO FILINGS IN SYSTEM @ THE DEPT AND NO REPAIRS HAVE COMMENCED REMEDY: COMPLY WITH ORDER #052421FEU10202IK
- Construction
Issued May 24, 2021 — FAILURE TO MAINTAIN BUILDING SAFE CONDN:SEE DOB VIO# 052421FEU10201IK FOR DESCRIPTION OF BUILDING AND CONDITIONS.BUILDING IS IN PROCESS OF BEING STABALIZED UNDER REFERENCED VIOLATION/ORDER.OWNER TO RETAIN NYS LIC PE + DOB REG CONTRCTR TO EVALU ENTRE BLDG + REPR UNDR PERMIT.FILE APPLIC FOR REPRS BY 8/1/21.BEGIN WRK BY 9/1/21.COMPLT WORK BY 4/1/22
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00830231-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00830231-I1
- BBL
- 1005390039
- Postal code
- 10012 · 702 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0