What the filing says
A public-record reading of the proposed work.
Filing for masonry facade and roof replacement work. no change to use, egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1927, with 42 homes, on a 13,017 sq ft lot.
- Built
- 1927
- Last altered
- 1992
- Floors
- 5
- Residential units
- 42
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6
- Lot area
- 13,017 sq ft
- Building area
- 42,435 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 15 notices on file; the most recent was issued Oct 9, 2024.
- Construction
Issued Oct 9, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED CRACK/ STEP CRACK & DAMAGED JOINT MULTIPLE LOCATIONS AT EXPOSURE 1. CRACK AND SPALLING/DAMAGE MASONRY AT EXPOSURE 2 SOUTH ELEVATION. REMEDY: MAINTAIN BUILDING: REPAIR AND/OR REPLACE
- Construction
Issued Jun 11, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT EXP1 EAST ELEV,STEP CRACK AT PARAPET AND MULTIPLE LOCATIONS AND DAMAGED JOI NTS.LONG VERTICAL CRACK AT SOUTHEAST CORNER.MULTIPLE DEFECT AT EXP2.SP ALLING VIEW AT EXP3 PARAPET AREA.REMEDY:REPAIR AND/OR REPLACE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X00913903-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X00913903-I1
- BIN
- 2009657
- BBL
- 2029290078
- Postal code
- 10457 · 273 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 42
- Proposed dwelling units
- 42