NYC DOB record · X00913903-I1

1639 Fulton Avenue

1639 Fulton Avenue, Bronx, NY 10457

Alteration filing in Claremont Village-Claremont (East), Bronx. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X00913903-I1

1639 Fulton Avenue

Bronx, NY 10457

Alteration filing · status dated Sep 22, 2026

Current record
Recorded as completed
Proposed scale
6 stories
Dwelling units
42
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X00913903-I1 as a alteration filing at 1639 Fulton Avenue, Bronx, NY 10457. Its latest published status category is Recorded as completed, dated Sep 22, 2026. The filing records 6 proposed stories and 42 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 22, 2026
Proposed scale
6 proposed stories and 42 proposed dwelling units
Applicant of recordSee the 5 filings that name Engineered Building Inspections, P.
FiledSep 25, 2023
Current recordRecorded as completed
Proposed scale6 stories
Recorded cost$806,700

What the filing says

A public-record reading of the proposed work.

Filing for masonry facade and roof replacement work. no change to use, egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1927, with 42 homes, on a 13,017 sq ft lot.

Built
1927
Last altered
1992
Floors
5
Residential units
42
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
13,017 sq ft
Building area
42,435 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 15 notices on file; the most recent was issued Oct 9, 2024.

  • Construction

    Issued Oct 9, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED CRACK/ STEP CRACK & DAMAGED JOINT MULTIPLE LOCATIONS AT EXPOSURE 1. CRACK AND SPALLING/DAMAGE MASONRY AT EXPOSURE 2 SOUTH ELEVATION. REMEDY: MAINTAIN BUILDING: REPAIR AND/OR REPLACE

  • Construction

    Issued Jun 11, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT EXP1 EAST ELEV,STEP CRACK AT PARAPET AND MULTIPLE LOCATIONS AND DAMAGED JOI NTS.LONG VERTICAL CRACK AT SOUTHEAST CORNER.MULTIPLE DEFECT AT EXP2.SP ALLING VIEW AT EXP3 PARAPET AREA.REMEDY:REPAIR AND/OR REPLACE

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X00913903-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X00913903-I1
BIN
2009657
BBL
2029290078
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
42
Proposed dwelling units
42
General construction