NYC DOB record · B00013486-I1

1642 Pitkin Avenue

1642 Pitkin Avenue, Brooklyn, NY 11212

Alteration filing in Brownsville, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00013486-I1

1642 Pitkin Avenue

Brooklyn, NY 11212

Alteration filing · status dated Dec 28, 2020

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00013486-I1 as a alteration filing at 1642 Pitkin Avenue, Brooklyn, NY 11212. Its latest published status category is Recorded as completed, dated Dec 28, 2020. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Dec 28, 2020
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3081033Applicant of recordSee the 257 filings that name Richard Wainer
FiledJan 31, 2018
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$1,638

What the filing says

A public-record reading of the proposed work.

Erect illuminated non advertising sign on wall. No change of use, egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1932, with 40 homes, on a 13,300 sq ft lot.

Built
1932
Last altered
2017
Floors
6
Residential units
40
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
C4-3
Lot area
13,300 sq ft
Building area
43,200 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 29 notices on file; the most recent was issued Sep 17, 2026.

  • Construction

    Issued Sep 17, 2026 — EWO DUE TO SHIFTED BRICKWORK,STEP CRACKING/VERTICAL CRACKIN IN BRICK MASONRY & DETERIORATED/DAMAGED MORTAR JOINTS OBSERVED AT EXPOSURE 3 (EAST ELEVATION) NEAR THE NORTH-EAST CORNER. REMEDY:IMMEDIATELY EXTEND SIDEWALK SHED ALONG EXP2N TO COVER NE CORNER OF EXP3 (E ELEV) UNDER THE DIRECTION OF A LICENSED PROFESSIONAL

  • Construction

    Issued Sep 17, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED AT THE TIME OF INSPECTION, OBSERVED CRACK ON MASONRY, DAMAGE MORTAR JOINTS, SPALLING BRICK AT EXPOSURE 3 AND EXPOSURE 4. DAMAGED/CRACKED WINDOW SILL OBSERVED AT EXPOSURE 4. REMEDY: REPAIR AND/OR REPLACE

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00013486-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00013486-I1
BBL
3035200032
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source
sign