NYC DOB record · B00693017-I1

1649 East 56 Street

1649 East 56 Street, Brooklyn, NY 11234

Alteration filing in Flatlands, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00693017-I1

1649 East 56 Street

Brooklyn, NY 11234

Alteration filing · status dated Oct 14, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00693017-I1 as a alteration filing at 1649 East 56 Street, Brooklyn, NY 11234. Its latest published status category is Approved, dated Oct 14, 2026. The filing records 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 14, 2026
Proposed scale
2 proposed dwelling units
The building, not the filingEvery filing at BIN 3236125, with the parcel and violation recordApplicant of recordSee the 45 filings that name Daniel Gerdes Architect
FiledApr 4, 2022
Current recordApproved
Proposed scale2 units
Recorded cost$1,333

What the filing says

A public-record reading of the proposed work.

Herewith is a filing post-amendment approval to remove and cap off gas line for the gas dryer in the basement., revise the gas riser diagram.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 2 notices on file; the most recent was issued Feb 28, 2022.

  • Construction

    Issued Feb 28, 2022 — OBSERVED AT TIME OF INSPECTION PLUMBING WORK AT CELLAR LEVEL AND CONSTRUCTION AT 1ST AND 2ND FLOOR REMOVAL PARTITIONS WALLS EXPOSED WOOD FRAMING. INTERIOR RENOVATION.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00693017-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00693017-I1
BBL
3083770012
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
2