What the filing says
A public-record reading of the proposed work.
Provide watre and gas piping support and protection and replace sump pump in the vault as per plans filed herewith. no change to use, egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 11-story condominium built in 1987, with 79 homes, on a 14,626 sq ft lot.
- Built
- 1987
- Floors
- 11
- Residential units
- 79
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-3
- Lot area
- 14,626 sq ft
- Building area
- 87,895 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 66 notices on file; the most recent was issued Feb 22, 2023.
- No report and / or late filing (facade)
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
- Failure to
Issued Jun 2, 2022 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
- Elevator
Issued Mar 5, 2021
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01448780-S3.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01448780-S3
- BBL
- 1001407501
- Postal code
- 10013 · 588 filings
- Review type
- Standard Plan Examination
- Existing stories
- 11
- Proposed stories
- 11
- Existing dwelling units
- 67
- Proposed dwelling units
- 67








