What the filing says
A public-record reading of the proposed work.
HVAC work in Unit/Roof includes new condenser units using existing building HVAC sleeves. Patch facade openings from removed through-wall AC units. New ceilings/lighting, relocation of a door, installation of millwork. No change to egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1911, with 21 homes, on a 6,623 sq ft lot.
- Built
- 1911
- Last altered
- 1985
- Floors
- 6
- Residential units
- 21
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C1-6A
- Lot area
- 6,623 sq ft
- Building area
- 39,750 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 18 open notices on record for this building, out of 44 notices on file; the most recent was issued Aug 26, 2025.
- Construction
Issued Aug 26, 2025 — FAILURE TO MAINTAIN. SUBMIT PLANS/DETAILS TO CEU BY 12/01/2025 REMEDY: OWNER TO RETAIN A NYS PE TO PREPARE PERMANENT RENOVATION PLANS AND DETAILS, FILE RENOVATION JOB & OBTAIN WORK PERMIT. SUBMIT PLANS/ DETAILS TO CEU
- Construction
Issued Aug 22, 2025 — FAILURE TO MAINTAIN.@TIME OF INSPECTION,OBSRVD MAIN ROOF DRAPED MESH UNDR CNCRTE SLAB IN A STATE OF DISREPAIR W/CRACKS,SAGGNG,&CORRODED REINFORCMNT.OBSRVD UNENGINEERD&INADEQUATE SHORNG PRTLLY.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT ROOF STRCTRE&REPAIR UNDR PRMT FILE FOR PRMTS BY 9/22/25.SGN OFF
- Construction
Issued Aug 22, 2025 — EMERGENCY WORK ORDER.@TIME OF INSPECTION,OBSRVD MAIN ROOF DRAPD MESH UNDR CNCRTE SLAB IN A STATE OF DISREPAIR W/CRCKS,SAGGNG,&CORRODED REINFORCMNT.OBSRVD UNENGINEERD&INADEQUATE SHORNG PRTLLY.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT ROOF STRCTRE&IMMED INSTLL TEMP SHORNG UNDR EMRGNCY WRK
15 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01448382-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01448382-I1
- BIN
- 1012010
- BBL
- 1006370077
- Postal code
- 10014 · 435 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 7
- Existing dwelling units
- 22
- Proposed dwelling units
- 22