NYC DOB record · M00769648-I1

165 West 86 Street

165 West 86 Street, Manhattan, NY 10024

Alteration filing in Upper West Side (Central), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00769648-I1

165 West 86 Street

Manhattan, NY 10024

Alteration filing · status dated Sep 17, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00769648-I1 as a alteration filing at 165 West 86 Street, Manhattan, NY 10024. Its latest published status category is Approved, dated Sep 17, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 17, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 1028 filings that name Enthink Engineering LLC
FiledJul 6, 2022
Current recordApproved
Proposed scaleNot specified
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story place of worship built in 1885, on a 10,157 sq ft lot.

Built
1885
Last altered
2026
Floors
3
Residential units
0
Building type
Place of worship
Land use
Public facilities and institutions
Zoning district
R10A
Lot area
10,157 sq ft
Building area
16,003 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 78 open notices on record for this building, out of 83 notices on file; the most recent was issued Apr 6, 2026.

  • Construction

    Issued Apr 6, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED THE FOLLOWING:MULTIPLE HAZARDOUS CONDITIONS AT ALL VIEW EXPOSURES AND ROOF AREA. CRACKS, SPALLED LOOSE BROWN STONE MISSING ROOF TILES & SHINGLES & CRACK MISSING WINDOW PANE. REMEDY: REPAIR AND/OR REPLACE

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued Sep 10, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTE AT TIME O F INSPECTION,OBSERVED AT EXP1 AND EXP2 MULTIPLE AREAS OF CRACKED STONE SPALLING STONE,WEATHERED STONE,MISSING STONE IN VARIOUS HEIGHTS AND LO CATIONS OF FACADE.REMEDY:REPAIR AND/OR REPLACE

  • 75 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00769648-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00769648-I1
BIN
1032188
BBL
1012170001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0
Sidewalk shed