NYC DOB record · X01117444-I1

168 Belden Street

168 Belden Street, Bronx, NY 10464

New building filing in Pelham Bay-Country Club-City Island, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Nov 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01117444-I1

168 Belden Street

Bronx, NY 10464

New building · status dated Nov 4, 2026

Current record
Approved
Proposed scale
1 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01117444-I1 as a new building at 168 Belden Street, Bronx, NY 10464. Its latest published status category is Approved, dated Nov 4, 2026. The filing records 1 proposed story and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Nov 4, 2026
Proposed scale
1 proposed story and 1 proposed dwelling unit
Applicant of recordSee the 141 filings that name Fang Architect
FiledNov 1, 2024
Current recordApproved
Proposed scale1 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Propose a new detached 1-story, 1-family modular house.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01117444-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 92,577 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01117444-I1
BIN
2091711
BBL
2056370030
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
1
Existing dwelling units
Empty in the source
Proposed dwelling units
1
General construction