What the filing says
A public-record reading of the proposed work.
New sanitary piping, new greas waste piping, connect new fixtures to exg building domestic water main, sanitary and vent main piping, new booster water heater.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 11.5-story condominium built in 1896, with 190 homes, on a 19,921 sq ft lot.
- Built
- 1896
- Floors
- 11.5
- Residential units
- 190
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R7-2
- Lot area
- 19,921 sq ft
- Building area
- 177,431 sq ft
- Historic district
- South Village Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 27 open notices on record for this building, out of 126 notices on file; the most recent was issued Sep 9, 2024.
- Construction
Issued Sep 9, 2024 — EWO DUE TO LOOSE PANEL LOCATION, 1 FLR EAST ELEVATION AT COMMERCIAL ENTERANCE OF L.P.R AND BROKEN WINDOW PANE AT EXPOSURE 3 WEST ELEVATION 3RD FLR. REMEDY: IMMEDIATELY REMOVED LOOSE SECTION AND MAKE REPAIRS UNDER SUPERVISION OF NYS LICENSED PROFESSIONA.PROVIDE SAFETY MEASURES
- Construction
Issued Sep 9, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:OBSERVED LOOSE PANEL AT EXPOSURE 1 EAST ELEVATION AT LPR ENTRANCE 1 FLOOR. EXPOSURE 2 SOUTH ELEVATION, DAMAGED WINDOW SILL 1ST FLOOR AND SPALLING BRICK 2ND FL.EXPOSURE 3 WEST ELEVATION, BROKEN WINDOW PANE,3FL/CRACK FLOOR REMEDY: MAINTAIN BUILDING REPAIR AND/OR REPLACE
- Hazardous condition (facade)
Issued Jan 10, 2022 — CYCLE 9A UNSAFE REPORT FILED
24 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01479088-S2.
- Current status updated02
The latest recorded filing status is “Prof Cert QA Review.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 93,320 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01479088-S2
- BBL
- 1005257501
- Postal code
- 10012 · 753 filings
- Review type
- Professional Certification
- Existing stories
- 10
- Proposed stories
- 10
- Existing dwelling units
- 190
- Proposed dwelling units
- 190








