What the filing says
A public-record reading of the proposed work.
Structural plans filed in conjunction with alteration type 2 filings 340568594 and 340633238.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story walk-up apartment building built in 1925, with 3 homes, on a 1,800 sq ft lot.
- Built
- 1925
- Floors
- 2
- Residential units
- 3
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6
- Lot area
- 1,800 sq ft
- Building area
- 2,430 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 9 notices on file; the most recent was issued Jan 8, 2020.
- Construction
Issued Jan 8, 2020 — FTM:3ST+C WOOD FRAME SEMI ATTACH RESIDENTIAL BLDG THAT SUSTAINED FIRE DMG ON 1/2/20.SEVERE FIRE DMG NOTED@ROOF FRAMING.DMG PARTY WALL NOTED AT 3RD FLOOR(PARTY WALL WITH 166 COVERT STREET)DMG NOTED AT EAST WALL MISSING WINDOWS AND WATER DMG THROUGHOUT.OWNR TO ENGAGE NYS PE&CONTRCT TO EVALUATE BUILDING & REPAIR UNDER PRMT.START REPAIR WRK BY 1/20/20
- Construction
Issued Jan 2, 2020 — DUE TO FIRE
- Fail to certify class
Issued Apr 17, 2019 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00230882-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00230882-I1
- BBL
- 3034230016
- Postal code
- 11207 · 3228 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 2
- Proposed dwelling units
- 2