NYC DOB record · M01376820-I1

1694 Madison Avenue

1694 Madison Avenue, Manhattan, NY 10029

Alteration filing in East Harlem (North), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01376820-I1

1694 Madison Avenue

Manhattan, NY 10029

Alteration filing · status dated Sep 18, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01376820-I1 as a alteration filing at 1694 Madison Avenue, Manhattan, NY 10029. Its latest published status category is Approved, dated Sep 18, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 18, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1080502Applicant of recordSee the 14 filings that name P&k Contracting Inc
FiledMar 24, 2026
Current recordApproved
Proposed scaleNot specified
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Suspended scaffold outrigger system for exterior facade restoration work and facade inspection at 1694 madison avenue manhattan ny 10029

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 19-story elevator apartment building built in 1959, with 792 homes, on a 298,710 sq ft lot.

Built
1959
Last altered
1986
Floors
19
Residential units
792
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-2
Lot area
298,710 sq ft
Building area
865,481 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 16 notices on file; the most recent was issued May 13, 2025.

  • Construction

    Issued May 13, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TI ME OF INSPECTION,OBSERVED ON EXP3 NORTH ELEV AND EXP4 EAST ELEV,ACS IN ADEQUATELY SUPPORTED EXP3 ON THE 10TH FL.NORTH/WEST END AND ON EXP4 EA ST ELEV AC INADEQUATELY SUPPORTED.EXP1 VERTICAL CRACK IN BRICK WORK ON 5TH FL,CRACKED,LOOSE BRICK ON 9TH FL.REMEDY:REPAIR AND/OR REPLACE

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

  • Facade safety program

    Issued Nov 19, 2019

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01376820-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01376820-I1
BBL
1016180001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source