NYC DOB record · B00396728-I1

17 Belvedere Street

17 Belvedere Street, Brooklyn, NY 11206

Alteration filing in Bushwick (West), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00396728-I1

17 Belvedere Street

Brooklyn, NY 11206

Alteration filing · status dated Jan 6, 2021

Current record
Approved
Proposed scale
2 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00396728-I1 as a alteration filing at 17 Belvedere Street, Brooklyn, NY 11206. Its latest published status category is Approved, dated Jan 6, 2021. The filing records 2 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Jan 6, 2021
Proposed scale
2 proposed stories and 2 proposed dwelling units
The building, not the filingthe owner of record and every filing at BIN 3071778Applicant of recordSee the 43 filings that name Structural Engineering Integrated,
FiledSep 11, 2020
Current recordApproved
Proposed scale2 stories
Recorded cost$2,728

What the filing says

A public-record reading of the proposed work.

Paa filed to amend minor plan changes to include rebuilding foundation wall in basement as per plan

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story two-family home built in 1920, on a 2,242 sq ft lot.

Built
1920
Last altered
2019
Floors
3
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
M1-1
Lot area
2,242 sq ft
Building area
2,539 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 21 notices on file; the most recent was issued Nov 16, 2022.

  • Construction

    Issued Nov 16, 2022 — FTM. WOOD FRAME, ROOF & NOGGIN BRICKS HAVE BEEN REMOVED @ THE INDEPNDT WALLS @ EXP2&4. ADJ BUILDING EXT WALLS ARE EXPOSED & NOT WEATHERPROOF OWNER TO ENGAGE A NY & ENDORSED CONTRACT TO ACHIEVE WATERTIGHTNESS @ THE BUILDING. INSTALL A ROOF & PROTECT ADJ PROP

  • Construction

    Issued Nov 16, 2022 — FTM. WOOD FRAME, ROOF & NOGGIN BRICKS HAVE BEEN RMVD AT THE INDEP WALLS AT EXP2&4. 2ND FL IS ACTING AS A ROOF. ADJ BLDG EXT WALLS ARE EXPD & NOT WEATHERPROOF. OWNR TO ENGAGE A NYSPE & ENDORSED CONTRACTOR TO EVAL WHOLE BLDG & OBTAIN PERMITS TO REPAIR/LEGALIZE WORK

  • Construction

    Issued May 5, 2021 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN VIOLATION 090820CE30401NB ISSUED ON 9/08/20 LAPSE IN SUBMISSION OF STRUCTURAL STABILITY REPORT LAST REPORT DUE BY 4/30/21 NO DUC/CORESPONDENCE RECIEVED, REMEDY COMPLY WITH COMMISSIONER'S ORDER

  • 6 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00396728-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00396728-I1
BBL
3031350041
Review type
Professional Certification
Existing stories
2
Proposed stories
2
Existing dwelling units
2
Proposed dwelling units
2
Structural work