What the filing says
A public-record reading of the proposed work.
Filing application for interior renovation of penthouse 2B. Work includes removal and installation of interior non-load bearing partitions. Plumbing work filed subsequently in DOB NOW. No change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 19-story condominium built in 2005, with 96 homes, on a 29,407 sq ft lot.
- Built
- 2005
- Floors
- 19
- Residential units
- 96
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R10A
- Lot area
- 29,407 sq ft
- Building area
- 280,670 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01243065-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01243065-I1
- BBL
- 1015847501
- Postal code
- 10128 · 353 filings
- Review type
- Standard Plan Examination
- Existing stories
- 19
- Proposed stories
- 19
- Existing dwelling units
- 98
- Proposed dwelling units
- 98








