What the filing says
A public-record reading of the proposed work.
Interior renovation of existing dwellings on floors 28, 29, 30, and 31 (aka ph-a, ph-b, ph-c, ph-d). work includes new partitions and lighting. no change to use, occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 34-story condominium built in 2016, with 72 homes, on a 10,752 sq ft lot.
- Built
- 2016
- Last altered
- 2014
- Floors
- 34
- Residential units
- 72
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C5-2
- Lot area
- 10,752 sq ft
- Building area
- 116,877 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 21 notices on file; the most recent was issued Jun 29, 2026.
- Construction
Issued Jun 29, 2026 — FAILURE TO COMPLY WITH COMMISSIONR'S ORDER: DOB VIOLATION #081324CFA10 502YC REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES BY A NYS RED DESIGN & SUBMIT A REPORT TO FACADE VIA EMAIL IMMEDIATELY AS OF 6/29/2026, NO HANDS ON INSPECTION REPORT SUBMITTED TO FACADE UNIT. REMEDY: COMPLY WITH DOB VIOLATION #081324CFA10502YC IMMEDIATELY
- Hazardous condition (facade)
Issued Aug 14, 2024 — CYCLE 9C UNSAFE REPORT FILED
- Construction
Issued Aug 13, 2024 — AS PER INCIDENT, # OF BROKEN GLASS(WINDOWS/GUARDRAIL) OF TERRACES AND BALCOLNIES @ EXP 1 & 2, EAST & SOUTH ELEVS, AND LOOSE PLYWOOD OF GUARDRAIL OF BALCONIES. REMEDY: OWNER TO RETAIN NYS REGISTERED DESIGN PROFESSIONAL (RDP) TO PERFORM & INSPECT 100% HANDS-ON OF GLASS WINDOW/ GLASS GUARDRAIL OF ALL EXPOSURES. SUBMIT ALL REPORTS TO FACADE UNIT
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01468615-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01468615-I1
- BBL
- 1008637502
- Postal code
- 10016 · 1061 filings
- Review type
- Professional Certification
- Existing stories
- 34
- Proposed stories
- 34
- Existing dwelling units
- 72
- Proposed dwelling units
- 72








