What the filing says
A public-record reading of the proposed work.
THE STRUCTURAL WORK AS PER PLANS FILED HEREWITH INCLUDES INSTALLATION OF CONCRETE SUPPORTS FOR GROUND MOUNTED 5MW (22MWh) ENERGY STORAGE SYSTEM AND STRUCTURAL STEEL FRAMING SYSTEM FOR NFPA 15, IN OUTDOOR SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a garage or fuel station on a 1,750 sq ft lot.
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- M1-4
- Lot area
- 1,750 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Mar 27, 2026.
- Construction
Issued Mar 27, 2026 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPED UNDERPERMIT# B01248446-I1 ON 3/25/26.CONSTRUCTION SUPERINTENDENT WITHDRAWAL. 0% OF WORK COMPLETED.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01248446-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01248446-I1
- BBL
- 3037160027
- Postal code
- 11207 · 3228 filings
- Review type
- Standard Plan Examination
- Existing stories
- 1
- Proposed stories
- 1
- Existing dwelling units
- 0
- Proposed dwelling units
- 0