NYC DOB record · B00194036-I1

1724 Avenue P

1724 Avenue P, Brooklyn, NY 11229

Alteration filing in Madison, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00194036-I1

1724 Avenue P

Brooklyn, NY 11229

Alteration filing · status dated Dec 27, 2020

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00194036-I1 as a alteration filing at 1724 Avenue P, Brooklyn, NY 11229. Its latest published status category is Approved, dated Dec 27, 2020. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 27, 2020
Proposed scale
Not stated in this filing
Complete building dossierView all 3 filings associated with BIN 3182464Applicant of recordSee the 701 filings that name Haider Engineering, P.E.
FiledAug 5, 2019
Current recordApproved
Proposed scaleNot specified
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story educational building built in 1962, on a 24,000 sq ft lot.

Built
1962
Floors
2
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R5B
Lot area
24,000 sq ft
Building area
32,450 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 17 notices on file; the most recent was issued Feb 2, 2026.

  • Construction

    Issued Feb 2, 2026 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERAPPLICATION #320229980 ON JUNE 2, 2025 DUE TO APPLICANT WITHDRAWAL AT 2ND & 3RD FLR BRICK FACADE.

  • Construction

    Issued Jun 4, 2025 — THE APPLICANT OF RECORD FOR JOB # 340602921 HAS INFORMED THE DEPARTMENT THAT SHE OR HE HAS WITHDRAWN FROM THE PROJECT. APPLICATION FAILS TO SET FORTH FULL NAME, ADDRESS, PHONE NUMBER, EMAIL ADDRESS OF APPLICANT IN VIOLATION OF SECTION 28-104.8.3. UNTIL SUCH INFORMATION IS PROVIDED, YOU ARE ORDERED TO STOP ALL WORK IMMEDIATELYAND MAKE THE

  • Failure to

    Issued Feb 3, 2023 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • 6 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 8, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00194036-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00194036-I1
BBL
3067800001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0