What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. livel load 300 per square feet. sidewalk shed shall comply with chapter #33 of the 2014 code. no change in use occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story two-family home built in 1920, on a 4,155 sq ft lot.
- Built
- 1920
- Last altered
- 1996
- Floors
- 3
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R5
- Lot area
- 4,155 sq ft
- Building area
- 9,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 13 notices on file; the most recent was issued Feb 10, 2026.
- Construction
Issued Feb 10, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN VIOLATION #010826CE31201AD WITH ASSOCIATED CONTROL #376503 ISSUED ON 01/08/26 REMEDY: COMPLY WITH AFOREMENTIONED COMMISSIONER'S ORDER BY 2/17/26 RESUME WEEKLY STRUCTURAL STABILITY INSPECTIONS AND SUB TO NYC DOB CSE BY E-MAILING ANDOULAH@BUILDINGS.NYC.GOV & JROLON@BUILDINGS.NYC.GOV
- Construction
Issued Jan 8, 2026 — AS OF 1/8/26, STALLED SITE WITH OPEN ROOF, MISSING SHEATHING.(EXP#1 ), SAGGING FLOORS & UNBRACED WALLS. SITE UNSAFE & NEEDS MONITORING PLAN. REMEDY: RETAIN NYS PE FOR WEEKLY REPORTS & SAFETY PLAN. FIRST DUE ON 1/16/26.EMAIL SIGNED/SEALED RPTS W/PHOTOS WEEKLY TO CSENGINEERG
- Construction
Issued Jan 8, 2026 — AS OF 1/8/26, STALLED SITE WITH OPEN ROOF, MISSING SHEATHING.(EXP#1 & #4), SAGGING FLOORS & UNBRACED WALLS. STRUCTURE IS UNSAFE;STABILIZATN OR REMOVAL REQUIRED. REMEDY: RETAIN NYS PE TO SUBMIT PLANS BY 1/23/26 FILE ON DOBNOW & PULL PERMITS BY 1/26, EMAIL SEALED PLANS TO CSENGINEERING
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00473729-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00473729-I1
- BIN
- 3130529
- BBL
- 3054860018
- Postal code
- 11204 · 1865 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2