NYC DOB record · X01039257-I1

1730 Popham Avenue

1730 Popham Avenue, Bronx, NY 10453

Alteration filing in University Heights (South)-Morris Heights, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 18, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01039257-I1

1730 Popham Avenue

Bronx, NY 10453

Alteration filing · status dated Sep 16, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
36
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01039257-I1 as a alteration filing at 1730 Popham Avenue, Bronx, NY 10453. Its latest published status category is Approved, dated Sep 16, 2026. The filing records 36 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 16, 2026
Proposed scale
36 proposed dwelling units
Applicant of recordSee the 128 filings that name Msm Engineering Services, PLLC
FiledApr 20, 2024
Current recordApproved
Proposed scale36 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1937, with 36 homes, on a 6,700 sq ft lot.

Built
1937
Floors
6
Residential units
36
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R5
Lot area
6,700 sq ft
Building area
34,200 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 35 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued Oct 22, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#347811 VIO#073025PI20501SB DATED 07/30/25 REQUIRING OWNER TO PROVIDE CORRECTIVE ACTION PLAN BY 8/30/25 &START BLDG REPRS UNDER PERMIT BY 9/30/25&COMPLETED/SIGNED OFF BY 10/30/25.AS OF 10/22/25 A CAP&EVIDENCE OF COMPLETED REPR WORK NOT RECD IMMED COMPLY W/COMMISSIONER'S ORDER #347811 VIO#073025PI20501SB

  • Construction

    Issued Jul 30, 2025 — CORRECTIVE ACTION PLAN REQ'D-@ EXP1 OBSVD DETERIORATING/LOOSE MORTAR JOINTS @ PARAPET LEVEL & MASONRY CRACKS @ MULT LOCATIONS. @ EXP2 OBSVD SPALLING MASONRY. IMPROPER REPAIRS OF MASONRY @ MULT LOCATIONS @ EXP1 OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & TO SUBMIT CORRECTIVE ACTION PLNA BY 8/30/25 BLDG T/BE REPAIRED UNDER PERMIT

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01039257-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01039257-I1
BIN
2008928
BBL
2028770431
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
36
Proposed dwelling units
36
Sidewalk shed