What the filing says
A public-record reading of the proposed work.
Install commercial kitchen new grease exhaust and make up air system
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1930, with 41 homes, on a 5,066 sq ft lot.
- Built
- 1930
- Last altered
- 2012
- Floors
- 6
- Residential units
- 41
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C2-8
- Lot area
- 5,066 sq ft
- Building area
- 27,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 20 notices on file; the most recent was issued Mar 29, 2025.
- Construction
Issued Mar 29, 2025 — TRANSFERRING OBJECTIONS FROM APPLICATION M359680 THAT WERE ISSUED BY INSPECTOR UMS, TO THE OWNER AS A DOB VIOLATION AFTER MULTIPLE FAILED ATTEMPTS AT GAINING ACCESS TO CORRECT THE OBJECTIONS BY THE CONTRACTOR. KITCHEN COUNTERTOP RECEPTACLE OUTLETS DON'T MEET SPACE REQIRMENTS210.52(C)(1)
- No report and / or late filing (facade)
Issued Apr 30, 2019 — FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01449201-I1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,354 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01449201-I1
- BIN
- 1050120
- BBL
- 1015520029
- Postal code
- 10128 · 427 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 41
- Proposed dwelling units
- 41








